GOST 52059-2003 STATE STANDARD OF THE RUSSIAN FEDERATION Services Household Services in repair and construction of houses and other buildings General specifications GOSSTANDART RUSSIA Moscow Preface 1 developed and submitted by the Technical Committee for Standardization TC 346 "Consumer Services" and FSUE TsNIIByt 2 adopted and put into operation the Decree of the State Standard of Russia May 28, 2003 № 162-v. 3 first introduced CONTENTS 1 Scope. January 2 Normative references. March 2 Definitions. April 2 Classification. March 5 General requirements. June 3 security requirements. May 7 Requirements of environmental protection .. June 8 Rules of acceptance. 6 Appendix A. Bibliography. 7 GOST R 52059-2003 STATE STANDARD OF THE RUSSIAN FEDERATION Services Household Services in repair and construction of houses and other buildings General Specifications Services. Services on the repairing and construction of the habitation and other buildings. General specifications Effective date 1/1/2004 1 Scope This standard establishes general technical requirements for repair and construction of houses and other buildings, safety services to the life and health of the consumer, keeping their property and the environment. This standard applies to organizations and individual businessmen (hereinafter - the performers), providing services for the construction of newly built private housing and other buildings (hereinafter - the building services), reconstruction and repair of the exploited housing and other buildings, and operated apartments in residential buildings by individual orders of the population (hereinafter - the repair services). This standard is fundamental in the development of normative documents for the repair and construction of houses and other buildings of a particular species. 2 Normative references in this standard references to the following standards and normative documents: GOST 12.1.004-91 safety standards system. Fire safety. General requirements of GOST 12.1.019-79 safety standards system. Electrical GOST 27751-88 reliability of building structures and grounds. Basic provisions on the calculation of SNIP 2.03.11-85 protection of building structures against corrosion SNIP 2.04.05-91 Heating, ventilation and air conditioning SNIP SNIP 2.08.01-89 2.04.08-87 Gas Residential SNIP 3.01.04-87 acceptance for operation completed construction projects SNIP 3.02.01-87 earthworks, foundations and foundations SNIP 3.03.01-87 bearing and protecting designs SNIP 3.04.01-87 insulation and finishes SNIP 3.05.01-85 Internal sanitary systems snip 03/05/2004 -85 External networks and facilities of water supply and sanitation SNIP 3.05.06-85 Electrical devices SNIP SNIP 3.06.03-85 Highways 03.12.1999 safety in construction SNIP 21-01-97 Fire safety of buildings and structures snip 31.02 -2001 House residential detached SNIP III-4-80 Safety in the construction of SNIP II-10-75 improvement areas SanPiN 2.1.2.1002-2000 Sanitary-epidemiological rules and standards SanPiN 2.1.4.1074-2001 Drinking Water. Hygienic requirements for water quality of centralized drinking water supply systems. Quality control SanPiN 2.1.4.544-96 water quality requirements, centralized water supply. Sanitary protection of sources OK 002-93 National Classification services to the public UC 004-93 National Classification of Economic Activities, products and services 3 Definitions In this standard, the following terms and definitions: 3.1 Construction Services: The result of the performers - a project under construction and completed construction of low-rise dwellings (houses, buildings) or other buildings on the individual customer's order, which includes design, construction, installation, finishing and commissioning or just construction, installation and finishing work. Note - Common Terms (civil works, etc.) in this standard are not shown. Appointment and list of works indicated in the estimates for construction or renovation of housing and other buildings. 3.2 repair services: results of the performers - the construction and repair work to restore the performance of low-rise dwellings (houses, buildings), apartments in residential buildings or other structures on the individual customer's order. 3.3 services for reconstruction: Results of the performers - the construction, installation, finishing work for the reconstruction (reconstruction, redevelopment, conversion, etc.) of individual housing and other buildings. 3.4 Housing: Detached houses, locked houses (SNIP 2.31), low-rise housing [1], apartments in residential building. 3.5 low-rise housing: Low-rise apartment building, low-rise building or a group with the land, household and auxiliary buildings, and other objects at them [1]. 3.6 Other buildings: Household and auxiliary buildings (snip 08.02.2001, OK 002). 3.7 complex repair: Carrying out a complex operation to reconstruct or restore the performance of housing or other buildings for individual orders. 3.8 Partial repair: Repair or replace worn or damaged building elements of housing or other buildings for individual orders. 3.9 developer (customer): The consumer services for the construction, repair and reconstruction of individual dwellings or other buildings, landscaping house territories. 3.10 passports low-rise homes: Regulatory instructional instrument [1]. 3.11 building elements: Construction materials, construction and equipment. 4 Classification 4.1 to the grounds of the classification of services for repair and construction include: - Technology - the type of work - the type of building elements. 4.2 The technological basis of repair and construction is divided as follows: - construction - repairs (complex, partial); - renovation - other services (development of design estimates for construction and reconstruction of residential and other buildings, landscaping house territories and m . etc.) QA 002. 4.3 On the type of work repair and construction is divided into construction, repair and construction and installation. 4.4 According to the type of building elements (such as wooden floors, cement, etc.) repair and construction is divided by UC 002, UC 004. 5 General requirements 5.1 Repairs and construction must comply with this standard, regulatory and technical documents for the services of a particular species. 5.2 The provision of services for repair and construction of the binding conditions are: - a performer licenses for the construction of buildings and structures - a contract with the consumer - the existence of design estimates for construction and reconstruction, the presence of defects in the repair of statements - the existence of building elements - the professional level of skill and qualification artist and his knowledge of safety and health standards - the existence of regulatory and technical documents for services to repair and build housing and other buildings - the existence of a passport of low-rise apartment building after building completion certificate issued work performed on construction, reconstruction and repair of housing and other buildings. 5.3 Receiving and processing orders for repair and construction must follow the rules of consumer service in the Russian Federation [2]. 5.4 In providing services for the construction of housing construction on individual orders must be carried out on a standard or an individual project in accordance with the requirements of SNIP 08/02/2001, 2.31 SNIP, SanPiN 2.1.2.1002, existing building codes and regulations for type of work. Project development by the Executive, which has a license to work on designing buildings and structures. When individual construction of homes can use the simplified procedures for the development, coordination, approval of project documentation, supervision during construction, acceptance at home and putting it into operation. Allowed to erect farm or ancillary buildings without a plan developed and agreed in due course. 5.5 In performing services for the construction of custom-home placement and other buildings on the land must comply with the limits in the permit for construction and (or) architectural-planning assignment, in accordance with applicable laws, regulations on the design and construction, and subject to the rights residents of neighboring houses (SNIP 2.31). 5.6 Composition of the premises, their size, composition of the engineering equipment in the individual construction of houses or other buildings should be determined by the consumer services with the creation of conditions for all the activities normally undertaken by a residential home. 5.7 In providing services for construction and repair of structures and parts should be made of certified materials and are protected from adverse environmental factors (03.02.1911 SNIP, SNIP 2.31). 5.8 In the course of performance of services for all types of construction, reconstruction and repair of the performer must perform operational control in the presence of the customer or his official representative. 5.9 Upon delivery of the house in operation acceptance of home exercise on compliance with the project in accordance with the requirements of SNIP 03/01/2004. 5.10 Certificate of low-rise housing, manufactured on a standard or an individual project must be forwarded to the developer after construction of dwelling house and enter the house in operation. 5.11 At the request of the customer in the documentation for the house should be Heat Power passport. Rules of calculation of the energy expenditure of resources in the operation of low-rise apartment building - to snip 2.31. For houses with walls made of chopped logs with an area of ??heated space of 60 m2, these rules do not apply. 12.5 Subject to the regulations operated home should keep their properties in accordance with the requirements of SNIP 2.31 during the expected life, which can be mounted in planning permission. Assessment of the life of low-rise houses should be made by [1, 3]. 5.13 Neremontiruemye elements of the home, providing him the strength and durability, must maintain their properties to meet the requirements of GOST 27751 and snip on the constructions of the relevant materials. Elements, parts, equipment, service life is less than the expected life of the house, must be interchangeable in accordance with the maintenance period established in the Project (SNIP 2.31). 5.14 Services for the assembly of log and bruschatyh log cabins and timber frame homes have according to the instructions of the manufacturer organization. Allowed to erect log or shield the house from building materials performer. 5.15 Facilities for the construction of cottages should be carried out according to the current organization of the documentation of the manufacturer or by a project developed with the wishes of the customer. 5.16 Major improvement works house territories and acceptance of work performed must comply with: - snip 03/02/2001 - Drainage device - 03/04/2001 snip, SNIP III-10 - a device blind area; - SNIP III-10 - the unit of sidewalks and walkways - SNIP 03/06/2003 - device blacktop. 5.17 In providing services for the reconstruction of housing construction work should be carried out in stages: preparation of individual conceptual design, development on it working draft approval of the project, the reconstruction of. Upon completion of the reconstruction should be drawn up new technical plan for the home. 5.18 Construction work performed for reconstruction of standard flats in residential buildings for individual orders, should be in accordance with legal norms and technical rules to make possible changes to residential areas, certain orders of the local government. Upon completion of work shall be drawn up a new technical floor plan. 5.19 Phased implementation of construction works for the provision of services to repair or reconstruction shall conform to the budget documentation. 5.20 Major repairs of basements, cellars, flooring of all kinds, roofing, cladding of external or internal walls of various materials, plastering walls, ceilings, columns, binding ceilings and tiles, paint, wallpaper, glass, insulation work to be performed by SNIP 04/03/2001; installation of internal plumbing systems - to snip 05/03/2001; assembling electrical networks - to snip 03.05.2006 in accordance with the rules of Electric Plant (SEP) and GOST 12.1.019, installation of doors, window frames, doors and window frames - to snip 03/03/2001, repair and relining of furnaces and chimneys - to snip 04/02/2005; work on gas supply - to snip 02/04/2005; drilling - to snip 03/05/2004. 6 Security Requirements 6.1 In the course of providing services for construction and repair of individual orders of the population should be provided for life safety and health of the developer, security and safety in accordance with SNIP III-4, SNIP 3.12. 6.2 When the need for disassembly of old structures house or apartment before the renovation or demolition of buildings before construction of the Executive should develop measures to ensure the safety of the work. 6.3 Sent developer erected housing, utility and auxiliary buildings must be safe during operation (SNIP 2.31). The instructions included in the passport of low-rise dwellings, should include: - basic design and engineering systems - layout of the hidden elements of a skeleton hidden wiring and utilities - limit the load on the elements of home construction and the electricity grid. 6.4 Sanitary-epidemiological requirements for housing - at SanPiN 2.1.2.1002. 6.5 The project for construction or reconstruction of housing should be provided for fire prevention measures on SNIP 1.21, 2.31 SNIP. 6.6 Fire safety during construction or repair work should be undertaken in accordance with the requirements of GOST 12.1.004. 6.7 Internal pipeline must meet the requirements of SNIP 02/04/2008. 6.8
No comments:
Post a Comment